Office Strip Out Melbourne
Commercial office strip out and defit works for lease exits, make good projects and tenancy handovers across Melbourne. We remove redundant fitout and prepare the office for repair, reinstatement or the next stage of works.
OFFICE STRIP OUT CAPABILITIES
Our office strip out service removes the redundant fitout while preparing the tenancy for repair, reinstatement and handover.
STRIP OUT SCOPE
- Removal of plasterboard, glazed or modular partitions and meeting rooms
- Removal of office layout alterations and selected tenancy fitout
- Removal of built-in cupboards, counters, shelving and wall fixtures
- Removal of screens, whiteboards, selected furniture and nominated loose items
SERVICES & SURFACE PROTECTION
- Removal of carpet tiles, vinyl, timber-look flooring and adhesives
- Removal or adjustment of nominated ceiling elements
- Coordination of make safe requirements where required
- Protection of surfaces and building elements that need to remain
WASTE & MAKE GOOD PREPARATION
- Removal of internal signs, decals, wall graphics and tenancy branding
- Sorting, loading and disposal of strip out material
- Tenancy prepared for patching, painting and flooring reinstatement
- Site left ready for final handover works or the next trade stage
STRIP OUT WORKS THAT SET UP THE MAKE GOOD

An office strip out is the first stage of many lease end make good projects. Partitions, workstations, joinery, floor finishes, ceiling alterations, signage and redundant fixtures need to be removed before the tenancy can be repaired and reinstated.
A rushed office strip out can damage walls, ceilings, floors, door frames, services and common areas. It can also leave behind adhesive, anchors, redundant fixtures and unfinished surfaces that slow down the make good works that follow. Office buildings also bring practical constraints. Lifts, loading docks, after-hours access, noise limits, protection of common areas and disposal arrangements all need to be planned before work begins.
Make Good Melbourne completes office strip out works across Melbourne for commercial tenants, landlords, property managers and builders. We focus on controlled removal, practical sequencing and preparing the site for the next stage, whether that is make good, refurbishment, re-leasing or base building works. A good strip out removes what needs to go while protecting the surfaces and building elements that need to remain.
OFFICE DEFIT, REMOVAL AND PREPARATION
Make Good Melbourne provides office strip out services as a standalone scope or as part of a broader make good project. We can remove partition walls, workstations, built-in joinery, meeting room fitouts, floor finishes, signage, loose fixtures and nominated tenancy alterations.
Where required, we coordinate make safe works, waste removal and preparation for patching, painting, flooring or ceiling reinstatement, with the goal of leaving the tenancy ready for the next trade stage.
Because we complete make good works every day, we understand what the next trade needs after the strip out. We remove the fitout with the handover outcome in mind, not just the demolition task in front of us. That makes a difference on office projects where the strip out, wall repairs, painting, flooring and ceiling works need to connect properly. Our team can complete the strip out alone or manage the full make good scope from start to finish.
Our Process
Walk Through
We inspect the office and confirm what is being removed, retained or protected.
Scope and Access Planning
We prepare the strip out scope and plan lift use, loading, work hours and site controls.
Make Safe Coordination
Where required, relevant services are made safe before removal works begin.
Strip Out Works
Fitout items, partitions, fixtures, flooring and nominated elements are removed in the correct order.
Site Preparation
The space is prepared for patching, painting, flooring, ceiling reinstatement or handover.
Related Services

Demolition
From office de-fits to warehouse strip-outs, we restore your tenancy to its base condition. We remove partitions, ceilings and floor coverings, working within your project timeframes to ensure your make good is ready for handover on time.
Learn More
Make Safe
We disconnect and make safe all building services for your end-of-lease make good, returning all cabling back to base with full certification.
Learn More
Office Make Good
Office make good works for commercial tenants, property managers and landlords across Melbourne. We remove redundant fitout, repair surfaces, reinstate finishes and prepare office tenancies for lease handover.
Learn MoreFrequently Asked Questions
Need an Office Stripped Out for Handover?
We do make goods all day, every day.
Send through the office address, photos, lease timing and any make good notes. We will assess the strip out scope and provide a practical quote.
Share the details and we'll come back to you with how we can help.